SKI-DOO

Position
Set Ascending Direction

Grid List

10 per page

Items 121 to 130 of 481 total

  1. SUMMIT RAIL REINFORCEMENT - 146" AND UP WITH TMOTION AND CMOTION REAR SUSPENSIONS

    SUMMIT RAIL REINFORCEMENT - 146" AND UP WITH TMOTION AND CMOTION REAR SUSPENSIONS

    €149.73
    Lightweight cast aluminum construction Can replace stock stiffner on Freeride Compatibility 146" AND UP WITH TMOTION AND CMOTION REAR SUSPENSIONS Availability date: 3-9 days
  2. LinQ Cargo Decal Kit

    LinQ Cargo Decal Kit

    €44.69
    Compatibility Required for installation of LinQ Thermos Box (295100698) on REV Gen4 (Narrow) Availability date: 3-9 days
  3. EXTREME SKID PLATE KIT - REV-XM, REV-XS

    EXTREME SKID PLATE KIT - REV-XM, REV-XS

    €167.75
    Injection molded process provides smooth surface, better definition, a perfect fit and easier installation For assertive riders who demand the utmost protection Smooth bottom surface to reduce drag 4 mm thick high impact resistance polypropylene for durability Extra wide, covers vital primary clutch, chaincase and front heat exchanger components to provide maximum underbelly protection Attachment kit included Chassis is premarked for easy installation Includes marking for 4-stroke oil change cut-out Wide shape for full protection and maximum flotation Compatibility REV-XM, REV-XS Availability date: 3-9 days
  4. SNOWFAP - REV-XP,  XU EXPEDITION 2009 AND UP,  XR (EXCEPT GTX AND GRAND TOURING)

    SNOWFAP - REV-XP, XU EXPEDITION 2009 AND UP, XR (EXCEPT GTX AND GRAND TOURING)

    €117.40
    Customize your sled Hardware included Compatibility REV-XP, XU EXPEDITION 2009 AND UP, XR (EXCEPT GTX AND GRAND TOURING) Availability date: 3-9 days
  5. Windshield Base

    Windshield Base

    €26.67
    Colored plastic trim Hardware not included Compatibility: REV-XM, XS For ultra low, low and one-piece windshields Availability date: 3-9 days
  6. Windshield Base

    Windshield Base

    €36.88
    Colored plastic trim Hardware not included Compatibility: REV-XM, XS For medium and high windshields Availability date: 3-9 days
  7. XPS 2-Stroke Full Synthetic Oil (946 ml)

    XPS 2-Stroke Full Synthetic Oil (946 ml)

    €24.46
    Specifically engineered to meet the unique needs of Rotax engines, it provides maximum protection against engine wear in E-TEC engines Uses a highly-evolved additive package to keep engine parts lubricated, clean and free of wear This low smoke, low odor formula also allows for maximum engine performance Can be used in direct, semi-direct fuel injection system and high performance carbureted 2-stroke engines Availability date: 3-9 days
  8. XPS 2-Stroke Full Synthetic Oil (3.785 L)

    XPS 2-Stroke Full Synthetic Oil (3.785 L)

    €86.23
    Specifically engineered to meet the unique needs of Rotax engines, it provides maximum protection against engine wear in E-TEC engines Uses a highly-evolved additive package to keep engine parts lubricated, clean and free of wear This low smoke, low odor formula also allows for maximum engine performance Can be used in direct, semi-direct fuel injection system and high performance carbureted 2-stroke engines Availability date: 3-9 days
  9. XPS 2-Stroke Mineral Oil (946 ml)

    XPS 2-Stroke Mineral Oil (946 ml)

    €14.37
    Designed for use in carbureted engines as an injection oil or premix, it is made from high-quality mineral based stocks It includes the detergency package engineered exclusively for use in Rotax engines Performs consistently throughout a broad temperature range - flows down to -40°F /-40°C - and offers excellent lubrication in all conditions Availability date: 3-9 days
  10. XPS 2-Stroke Mineral Oil (3.785 L)

    XPS 2-Stroke Mineral Oil (3.785 L)

    €53.89
    Designed for use in carbureted engines as an injection oil or premix, it is made from high-quality mineral based stocks It includes the detergency package engineered exclusively for use in Rotax engines Performs consistently throughout a broad temperature range - flows down to -40°F /-40°C - and offers excellent lubrication in all conditions Availability date: 3-9 days
Position
Set Ascending Direction

Grid List

10 per page

Items 121 to 130 of 481 total